Commercial Project Portfolio

Our team will be there for every step of the way – including planning, designing, permitting, and constructing.

1

Featured Project:

Key West International Airport Expansion, Concourse A

In The Media

\
Key West Airport Begins $100 Million Expansion
\
KEY WEST AIRPORT READIES FOR $80M UPGRADE
\
COUNTY HIRES CONTRACTORS FOR $80M KEY WEST AIRPORT EXPANSION

Featured Project:

Signature FBO Terminal

New 4,500 SF Private Terminal Building with first floor parking garage. The terminal features a TV/Lounge area, Internet Café, Pilots Lounge with Quiet Rooms as well as a snack and vending area.
Signature FBO Terminal<br />
 Commercial Construction Project
Commercial Construction Project Key Haven Estates

Featured Project:

Key Haven Estates Phase 1 & 2

2 Story elevated homes all approximately 2900SF. All 4 homes have outdoor living/entertaining spaces on each level as well their own private pool.

Visit all of the properties of Key Haven Estates

Featured Project:

Casa Marina Resort

Dorada Restaurant & Bar

Dorada, a new beachfront dining and cocktail experience with an intimate sophistication and trendy Baja-Med cuisine.
Casa Marina Resort Dorada Restaurant and Bar Construction Project
Coconut Beach resort Construction Project

Featured Project:

Sun Outdoors Sugarloaf

RV Resort in the Lower Florida Keys

Renovation of a 98 Site RV Campground situated on 9 acres in Sugarloaf Key, Construction included new water, sewer and storm drainage infrastructure, a bathhouse, clubhouse, tiki huts, new aeration system, landscaping and docks along the 7 acre saltwater lake.

Visit Sun Outdoors Sugarloaf

Featured Project:

Garden View Apartments

The Key West Housing Authority

New construction of 104-unit multi-family housing development on Stock Island. The project consists of 3 buildings totaling 103 Workforce Housing Units and one Office Unit.

In The Media

\
103 New Apartments Open at Garden View in Key West
Garden view
happy landing

Featured Project:

Happy Landings Marina

\
75 brand new wet slips, Docks, Utilities & Amenities

This underused waterfront property is being transformed for the Key West boating community. The new marina will be able to accommodate 68 boat lifts with a starting capacity to lift 16,000 pounds.

In The Media

\
A New Marina Is Coming to Key West

Featured Project:

Florida Keys Aqueduct Authority

\
3 story, 38,000 SF
\
Boardroom with extensive audio visual systems
\
Florida Green Building Platinum Certification

The New Joe Pinder Administration Building is a 3-story Florida Green Building Platinum Certified Class A office building with ground level parking below.  At the time of construction, this Platinum Certification was achieved with the highest number of points accumulated for any building in the State of Florida.  This award winning project also received the Business for Beauty Award from the Key West Chamber of Commerce.  Building includes Board Room, public lobby with support services, offices and ancillary spaces.

Visit the FKAA website

fkaa

Visit the FKAA website

Grand Maloney 1080

Featured Project:

Grand Maloney Hotel

\
2 Story Historic Estate
\
6 Bedrooms
\
11 Foot Ceilings

Featured Project:

Coconut Beach Resort

Resort renovation that included the replacement of 156 exterior doors along with new electronic hardware, replacement of the electrical service disconnects as well as new landscaping, painting, rough carpentry work and hardscape.

Coconut Beach resort Construction Project
The Docks

Featured Project:

The Docks Restaurant & Bar

New 4,000 SF 50 seat restaurant with commercial kitchen, custom bar area, restrooms, new windows, exposed mechanical duct work and electrical.

Featured Project:

Faro Blanco Resort & Yacht Club

New construction of a 125-unit Hyatt Place Hotel. The project consisted of a commercial retail building, marina, and historic lighthouse restoration. Project included new cast in place concrete, masonry, and hollow core construction of new hotel and yacht club, demolition, dredging, and rebuilding a 70 slip marina. As well as, renovation of 65 year old historic lighthouse in the Middle Keys.

Faro Blanco 1
FYT Gym Before
FYT Gym - After
FYT Gym
=
Tenant improvement
=
5,000 SF new fitness center
=
Includes weight room, circuit room, heated yoga room, locker rooms, bathrooms, lobby
FYT Gym Before
FYT Gym - After

Marriott Beachside

FYT Gym Before
FYT Gym - After
SOS Callahan Community Kitchen
=
Complete renovation of the historic Glynn Archer School
=
Lockers into a 4,000 sf commercial kitchen including walk-in coolers, walk-in freezers, hot cook line, cold prep area and offices.
=
This kitchen now produces thousands of meals per week to the hungry and less fortunate in the Florida Keys.